Rewiring the Hospital

Too Many Wranglers and Too Many Electrical Snakes in Too Little Space

Too many wranglers and too many electrical snakes in too little space.  These Cable Cowboys are tearing out, rebuilding, and reinstalling the electrical ‘wall’ in the back-up generator room just to make sure that when PG&E goes out, we stay on.

Rewiring the Hospital

IMG_8415

Shift change at the ‘fire marshal station’.  Over the weekend while the power is ‘interruptible’, orange the new fashion statement… with a little ‘bull-horn’ bling on the side.

Rewiring the Hospital

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *